Nec ________ gives the rule for power and communication circuit combination raceways.

If you have a problem related to the National Electrical Code (NEC), are experiencing difficulty understanding a Code requirement, or are wondering why or if such a requirement exists, ask Charlie, and he will let the Code decide. Questions and comments can be sent to .

Communications and electric cables
Can communication cables be run in the same conduit with power/light conductors (4-wire, 208-volt, three-phase feeder)? We installed a 1-inch piece of nonmetallic tubing in the conduit and pulled in a Category 5 shielded cable with a 300-volt (V) rating. The local inspector insists we cannot do this, as 800.133 requires a minimum 2-inch separation. We believe the exception removes the requirement if there is a permanent barrier installed and our listed nonmetallic tubing meets this requirement. The conduit is large enough that conduit fill is not an issue.
NEC 800.133(A)(c) Exception No. 1 permits conductors of electric power and light to be run in the same raceway as communications conductors where the communications circuits are separated by a permanent barrier. The nonmetallic tubing provides the required separation.

A necessary nuisance
In the April 2010 column, you addressed a question about ground-fault circuit interrupters (GFCIs) for block heaters: “The use of GFCI-protected receptacles in outdoor areas is considered necessary for the safety of personnel and should be followed. I really don’t see a problem of nuisance tripping in this application and an alarm system could be incorporated to detect a tripped device. The NEC requirements are the minimum, [90.1(B)] and the designer can expand on them.”

This is one of those places where contractors get put into an awful quandary. My customer base includes several municipalities. For several of them, I installed GFCIs in their truck garages and adjacent outdoor parking spaces for block heaters. The problems were more severe than “nuisance” tripping; tripping was constant.

As much as I appreciate and support the Code, this is one of those places where the very restrictive rule just doesn’t work in the real world. In the interest of safety, we compromised, and they installed welding clamps with the leads permanently secured to building steel. They use them to ground the truck chassis before plugging in the block heater. They mounted signs at the receptacles, limiting their use to block heaters and only on positively grounded vehicles. The situation is not perfect. But they are safer than they were, and it was the best answer we could find by which they would abide. Several other towns adopted their approach, not having been able to make the GFCIs function. I wish the folks who write the Code could come up with a real-world solution, so that we could make a legal installation that our customers could safely live with.
Although it may be a nuisance to you, the ground-fault detector is just doing what it was designed and installed to do—detect ground faults within its range and de-energize the circuit. The GFCI will not open unless there is a ground fault. The ground fault is either in the engine block heater or in the cord that you are using to energize the block heater. The truck frame is not grounded, and when energized by a ground fault in the block heater or heater cord, it poses a serious threat to anyone in contact with ground and the engine frame. Grounding the truck frame to the building ground, as you have done, will, in the event of a ground fault, open the branch-circuit overcurrent device, depending on the magnitude of the ground fault, which of course results in de-energizing the block heater. So one way, the GFCI opens the circuit, and the other way, the branch-circuit overcurrent device opens the circuit.

It appears that you have an equipment and maintenance problem, which can be either in the cord feeding the heater or in the heater itself. In any case, we don’t want the frame of the vehicle to become energized where it will pose potential shock or electrocution hazard to anyone touching the energized frame while standing on the ground. I would suggest that you make the necessary repairs to your equipment and follow the safety provisions of the Code.

Ufer ground and ground ring
If a new steel building has a ground ring around the perimeter and bonding to the steel structure at four corners, does the building also need a Ufer footing ground?
NEC 250.50 requires that if a concrete-encased electrode (sometimes called a Ufer ground, after the man who developed the system) is present at the building, it must be bonded to the grounding-electrode system. Note that “present” does not mean available. If present but not available, it must be made available. The ground ring, metal frame of the building, underground metal water pipe, and the concrete-encased electrode must all be bonded together to form the grounding-electrode system.

Automatic transfer of loads
We are installing a backup generator rated 20 kilowatts (kW) 120/240V, single-phase, using a 200-amp (A) service entrance-rated automatic-transfer switch in a residence. The service size on the residence is 200A. The load analysis is 141A. The authority having jurisdiction (AHJ) is telling me that, per NEC 702.5(B)(2), I need to size the generator for the 141A. This would be a 35-kW generator. The homeowner understands that the 20 kW already purchased will not hold everything electrically if used at one time. They just want the air conditioner, kitchen, laundry and a couple of general circuits for use on the generator. I explained to the AHJ, if that was the case, 99 percent of generators installed are incorrect. I think 702.5(B)(2) is referring to the ATS switch and not the generator unit itself. The generator unit has a 100A breaker for OCP.
You have an 83A source (20 kW divided by 240) feeding a possible load of 141A. NEC 702.5(B)(2)(a) requires that where automatic-transfer equipment is used, the standby equipment must be capable of supplying the full load that can be transferred by the automatic-transfer equipment, or 702.5(B)(2)(b) permits the use of a load-management system that will automatically manage the connected load so that the standby source shall have a capacity to supply the maximum load that will be connected by the load-management system. The 100A circuit breaker overcurrent protection is not there for load management.

Circuit positioning
If a load center is mounted in a horizontal position, would it be a violation of 404.7, which requires that the up position of the circuit breaker handle shall be the on position? Most circuit breakers in load centers are installed so that moving the circuit-breaker handle horizontally to the center is the on or closed position. If the load center is mounted horizontally, wouldn’t the up position of the top row of breakers be the off or open position?
Yes, you are correct. For this reason, load centers (panelboards) are not permitted to be mounted in a horizontal position. The term “load center” is not used in the NEC. It is a manufacturer’s designation. The NEC requirements for panelboards covers load centers.

Capacity of on-site generators
If I have a 100-kilovolt-amperes (kVA) fire pump, is the size of the generator 100 kVA or 100 kVA 600 percent? Does the generator have to provide locked-rotor current for the fire pump motor?
In accordance with 695.3(B)(1), an on-site generator must have sufficient capacity to allow normal starting and running of the fire pump motor. It is not required to size for the locked-rotor current of the fire pump motor.

Identifying floating neutrals
What exactly is a floating neutral? Where is it?
A floating neutral is a neutral that is not bonded to ground in accordance with 250.20(B), which requires alternating current systems of 50V to 1,000V to be grounded in accordance with 250.26 where the conductor to be grounded on alternating systems is specified. Not bonding the neutral to ground can cause voltages that will subject loads to a dangerous overvoltage condition.

Sizes of motor load assets
Could you help me in to determine the sizes of the conductor protector, conductor and disconnecting means of the motor load?
The requirement for sizing motor branch-circuit conductors can be found in 430.22, which requires the conductors to have an ampacity of not less than 125 percent of the motor’s full-load current as shown in Tables 430.247, .248, .249, or .250. The motor branch-circuit short circuit and ground-fault protection for the motor branch circuit conductors is shown on Table 430.52. The required rating of the motor-disconnecting means is shown in 430.110.

TROUT answers the Code Question of the Day on the NECA Web site. He can be reached at .

The National Electrical Code (NEC), or NFPA 70, is a regionally adoptable standard for the safe installation of electrical wiring and equipment in the United States. It is part of the National Fire Code series published by the National Fire Protection Association (NFPA), a private trade association.[1] Despite the use of the term "national", it is not a federal law. It is typically adopted by states and municipalities in an effort to standardize their enforcement of safe electrical practices.[2] In some cases, the NEC is amended, altered and may even be rejected in lieu of regional regulations as voted on by local governing bodies.

Nec ________ gives the rule for power and communication circuit combination raceways.

The National Electrical Code, 2008 edition

The "authority having jurisdiction" inspects for compliance with these standards.[3][4]

The NEC should not be confused with the National Electrical Safety Code (NESC) published by the Institute of Electrical and Electronics Engineers (IEEE). The NESC is used for electric power and communication utility systems including overhead lines, underground lines and power substations.

The NEC is developed by NFPA's Committee on the National Electrical Code, which consists of twenty code-making panels and a technical correlating committee. Work on the NEC is sponsored by the National Fire Protection Association. The NEC is approved as an American national standard by the American National Standards Institute (ANSI). It is formally identified as ANSI/NFPA 70.

First published in 1897, the NEC is updated and published every three years, with the 2020 edition being the most current. Most states adopt the most recent edition within a few of years of its publication. As with any "uniform" code, jurisdictions may regularly omit or modify some sections, or add their own requirements (sometimes based upon earlier versions of the NEC, or locally accepted practices). However, no court has faulted anyone for using the latest version of the NEC, even when the local code was not updated.[5]

In the United States, anyone, including the city issuing building permits, may face a civil liability lawsuit for negligently creating a situation that results in loss of life or property. Those who fail to adhere to well known best practices for safety have been held negligent. This liability and the desire to protect residents has motivated cities to adopt and enforce building codes that specify standards and practices for electrical systems (as well as other departments such as water and fuel-gas systems). This creates a system whereby a city can best avoid lawsuits by adopting a single, standard set of building code laws. This has led to the NEC becoming the de facto standard set of electrical requirements.[6] A licensed electrician will have spent years of apprenticeship studying and practicing the NEC requirements prior to obtaining their license.

The Deactivation and Decommissioning (D&D) customized extension of the electrical code standard defined by National Electrical Code was developed since current engineering standards and code requirements do not adequately address the unique situations arising during D&D activities at U.S. Department of Energy (DOE) facilities. The additional guidance is needed to clarify the current electrical code for these situations. The guidance document provides guidance on how to interpret selected articles of NFPA 70, “National Electrical Code” (NEC), in particular certain articles within Article 590, “Temporary Power,” for D&D electrical activities at DOE sites.[7]

The NEC also contains information about the official definition of HAZLOC and the related standards given by the Occupational Safety and Health Administration and dealing with hazardous locations such as explosive atmospheres.

Public access

The NEC is available as a bound book containing approximately 1000 pages. It has been available in electronic form since the 1993 edition. Although the code is updated every three years, some jurisdictions do not immediately adopt the new edition.

The NEC is also available as a restricted, digitized coding model that can be read online free of charge on certain computing platforms that support the restricted viewer software; however this digital version cannot be saved, copied, or printed.

In the United States, statutory law cannot be copyrighted and is freely accessible and copyable by anyone.[8] When a standards organization develops a new coding model and it is not yet accepted by any jurisdiction as law, it is still the private property of the standards organization and the reader may be restricted from downloading or printing the text for offline viewing. For that privilege, the coding model must still be purchased as either printed media or electronic format (e.g. PDF.) Once the coding model has been accepted as law, it loses copyright protection and may be freely obtained at no cost.

The NEC is composed of an introduction, nine chapters, annexes A through J, and the index. The introduction sets forth the purpose, scope, enforcement, and rules or information that are general in nature. The first four chapters cover definitions and rules for installations (voltages, connections, markings, etc.), circuits and circuit protection, methods and materials for wiring (wiring devices, conductors, cables, etc.), and general-purpose equipment (cords, receptacles, switches, heaters, etc.). The next three chapters deal with special occupancies (high risk to multiple persons), special equipment (signs, machinery, etc.) and special conditions (emergency systems, alarms, etc.). Chapter 8 is specific to additional requirements for communications systems (telephone, radio/TV, etc.) and chapter 9 is composed of tables regarding conductor, cable and conduit properties, among other things. Annexes A-J relate to referenced standards, calculations, examples, additional tables for proper implementation of various code articles (for example, how many wires fit in a conduit) and a model adoption ordinance.

The introduction and the first 8 chapters contain numbered parts, articles, sections (or lists or tables), item, specifics, inclusions/exclusions, precise inlcusion/exclusion, italicized exceptions, and explanatory material – explanations that are not part of the rules. Articles are coded with numerals and letters, as ###.###(A)(#)(a). For example, 805.133(A)(1)(a)(1), would be read as "article 805, section 133, item (A) Separation from Other Conductors, specific (1) In Raceways, cable Trays, Boxes,... inclusion (a) Other Circuits, precise inclusion (1) Class 2 and Class 3...." and would be found in Chapter 8, Part IV Installation Methods Within Buildings. For internal references, some lengthy articles are further broken into "parts" with Roman-numerals (parts I, II, III, etc.).

Each code article is numbered based on the chapter it is in. Those wiring methods acceptable by the NEC are found in chapter 3, thus all approved wiring method code articles are in the 300s. Efforts have been underway for some time to make the code easier to use. Some of those efforts include using the same extension for both code articles and for the support of wiring methods.

The NFPA also publishes a 1,497-page NEC Handbook (for each new NEC edition) that contains the entire code, plus additional illustrations and explanations, and helpful cross-references within the code and to earlier versions of the code. The explanations are only for reference and are not enforceable.

 

Underwriters Laboratories, one of many of the testing laboratories recognized by OSHA.

Many NEC requirements refer to "listed" or "labeled" devices and appliances, and this means that the item has been designed, manufactured, tested or inspected, and marked in accordance with requirements of the listing agency. To be listed, the device must meet testing and other requirements set by a listing agency such as Underwriters Laboratories (UL), SGS North America, Intertek (Formerly ETL), Canadian Standards Association (CSA), or FM Approvals (FM). These are examples of "national recognized testing laboratories" (NRTL) approved by the U.S. Department of Labor's Occupational Safety and Health Administration (OSHA) under the requirements of 29 CFR 1910.7.[9] Only a listed device can carry the listing brand (or "mark") of the listing agency. Upon payment of an investigation fee to determine suitability, an investigation is started. To be labeled as fit for a particular purpose (for example "wet locations", "domestic range") a device must be tested for that specific use by the listing agency and then the appropriate label applied to the device. A fee is paid to the listing agency for each item so labeled, that is, for each label. Most NRTLs will also require that the manufacturer's facilities and processes be inspected as evidence that a product will be manufactured reliably and with the same qualities as the sample or samples submitted for evaluation. An NRTL may also conduct periodic sample testing of off-the-shelf products to confirm that safety design criteria are being upheld during production. Because of the reputation of these listing agencies, the "authority having jurisdiction" ( or "AHJ" – as they are commonly known) usually will quickly accept any device, appliance, or piece of equipment having such a label, provided that an end user or installer uses the product in accordance with manufacturer's instructions and the limitations of the listing standard. However, an AHJ, under the National Electrical Code provisions, has the authority to deny approval for even listed and labeled products. Likewise, an AHJ may make a written approval of an installation or product that does not meet either NEC or listing requirements, although this is normally done only after an appropriate review of the specific conditions of a particular case or location.

The electric code makes a distinction between "high" voltages above 100 volts, and "low" voltages below that. For circuits defined as low voltage, in some jurisdictions, there is no requirement for licensing, training, or certification of installers, and no inspection of completed work is required, for either residential or commercial work. Low voltage cabling run in the walls and ceilings of commercial buildings is also typically excluded from the requirements to be installed in protective conduit.

The precise reasoning for the selection of 100 volts as the division between high and low is not clearly defined, but appears to be based on the idea that a person could touch the wires carrying low voltage with dry bare hands, and not be electrocuted, injured, or killed. This is generally true for 12 volt systems, but becomes more ambiguous as the voltage increases to 100 volts.

The meaning also varies when alternating current is used, as there is the more commonly known root mean square voltage (120 V) but also a peak wave voltage (170 V). Telephones for example use low voltage cabling, but the ringing voltage from the central office has an RMS voltage of 60-105V.

Although low voltage cabling does not require inspection or training to install in some jurisdictions, it is still important for installers to be aware of specific safety rules such as how to correctly penetrate building fire barriers.

Article 210 addresses "branch circuits" (as opposed to service or feeder circuits) and receptacles and fixtures on branch circuits.[10] There are requirements for the minimum number of branches, and placement of receptacles, according to the location and purpose of the receptacle outlet. Ten important items in Article 210 have been summarized in a codebook.[11]

Feeder and branch circuit wiring systems are designed primarily for copper conductors. Aluminum wiring is listed by Underwriters Laboratories for interior wiring applications and became increasingly used around 1966 due to its lower cost. Prior to 1972, however, the aluminum wire used was manufactured to conform to the 1350 series aluminum alloy, but this alloy was eventually deemed unsuitable for branch circuits due to galvanic corrosion where the copper and aluminum touched, resulting in poor contact and resistance to current flow, connector overheating problems, and potential fire risk. Today, a new aluminum wire (AA-8000) has been approved for branch circuits that does not cause corrosion where it contacts copper, but it is not readily available and is not manufactured below size #8 AWG. Hence, copper wire is used almost exclusively in branch circuitry.

A ground fault circuit interrupter (GFCI) is required for all receptacles in wet locations defined in the Code. The NEC also has rules about how many circuits and receptacles should be placed in a given residential dwelling, and how far apart they can be in a given type of room, based upon the typical cord length of small appliances.

 

Polarized, grounding, 120 Volt receptacle

As of 1962, the NEC required that new 120 Volt household receptacle outlets, for general purpose use, be both grounded and polarized. NEMA connectors implement these requirements.

The NEC also permits grounding-type receptacles in non-grounded wiring protected by a GFCI; this only applies when old non-grounded receptacles are replaced with grounded receptacles, and the new receptacles must be marked with 'No equipment ground' and 'GFCI Protected' .

 

240 V receptacle faces

The 1999 Code required that new 240 volt receptacles be grounded also, which necessitates a fourth slot in their faces. Changes in standards often create problems for new work in old buildings.

 

A 120 volt combination AFCI/GFCI receptacle

Unlike circuit breakers and fuses, which only open the circuit when the current exceeds a fixed value for a fixed time, a GFCI device will interrupt electrical service when more than 4 to 6 milliamperes of current in either conductor leaks to ground. A GFCI detects an imbalance between the current in the "hot" side and the current in the "neutral" side. One GFCI receptacle can serve as protection for several downstream conventional receptacles. GFCI devices come in many configurations including circuit-breakers, portable devices and receptacles.

Another safety device introduced with the 1999 code is the arc-fault circuit interrupter (AFCI). This device detects arcs from hot to neutral that can develop when insulation between wires becomes frayed or damaged. While arcs from hot to neutral would not trip a GFCI device since current is still balanced, circuitry in an AFCI device detects those arcs and will shut down a circuit. AFCI devices generally replace the circuit breaker in the circuit. As of the 1999 National Electrical Code, AFCI protection is required in new construction on all 15- and 20-amp, 125-volt circuits to bedrooms.[12]

Conduit and cable protection

The NEC requires that conductors of a circuit must be inside a raceway, cable, trench, cord, or cable tray. Additional protection such as NM cable inside raceway is needed if the installation method is subjected to physical damage as determined by the authority having jurisdiction.

Temperature rating

The temperature rating of a wire or cable is generally the maximum safe ambient temperature that the wire can carry full-load power without the cable insulation melting, oxidizing, or self-igniting. A full-load wire does heat up slightly due to the metallic resistance of the wire, but this wire heating is factored into the cable's temperature rating. (NEC 310.10)[13]

The NEC specifies acceptable numbers of conductors in crowded areas such as inside conduit, referred to as the fill rating. If the accepted fill rating is exceeded, then all the cables in the conduit are derated, lowering their acceptable maximum ambient operating temperature. Derating is necessary because multiple conductors carrying full-load power generate heat that may exceed the normal insulation temperature rating. (NEC 310.16)

The NEC also specifies adjustments of the ampacity for wires in circular raceways exposed to sunlight on rooftops, due to the heating effects of solar radiation.[14] This section is expected to be modified to include cables in future editions.

In certain situations, temperature rating can be higher than normal, such as for knob-and-tube wiring where two or more load-carrying wires are never likely to be in close proximity. A knob-and-tube installation uses wires suspended in air. This gives them a greater heat dissipation rating than standard three-wire NM-2 cable, which includes two tightly bundled load and return wires.[15]

  • IEC 60364
  • Canadian Electrical Code
  • IEEE C2
  • PSE law, Japan Electrical Safety Law.
  • Slash rating
  • Central Electricity Authority Regulations
  • IET Wiring Regulations, UK Electrical Regulations

  1. ^ "National Electrical Code" and "NEC" are registered trademarks of the NFPA.
  2. ^ "Adoption of the National Electrical Code", NEMA.org
  3. ^ "What Are The NEC Area Classifications for a Firewatch?". Archived from the original on 6 January 2016. Retrieved 15 October 2012.
  4. ^ "Electrical Standards for Construction". U.S. DOL, OSHA. Retrieved 15 October 2012.
  5. ^ Chesapeake, I. E. C.; WECA (2012-01-08). Electrical Pre-Apprenticeship and Workforce Development Manual. Cengage Learning. ISBN 978-1133710752.
  6. ^ "NEC Adoption Map By State" (PDF). National Electrical Manufacturers Association. July 2019.
  7. ^ Electrical Code Guidance for Decontamination and Decommissioning Activities at DOE Facilities(D&D KM-IT Best Practice)
  8. ^ Link to text of the court's decision for 293 F.3d 791, Peter VEECK, doing business as RegionalWeb, Plaintiff-Counter Defendant-Appellant, v. SOUTHERN BUILDING CODE CONGRESS INTERNATIONAL, INC., Defendant-Counter Claimant-Appellee., No. 99-40632, United States Court of Appeals, Fifth Circuit, June 7, 2002 https://law.resource.org/pub/us/case/reporter/F3/293/293.F3d.791.99-40632.html
  9. ^ "Nationally Recognized Testing Laboratories (NRTLs) | Current List of NRTLs". www.osha.gov. Retrieved 2016-03-28.
  10. ^ Electrical Construction and Maintenance Magazine, Branch Circuits, Part 2, http://ecmweb.com/nec/code-basics/electric_branch_circuits_part_2/index.html
  11. ^ National Electrical Code Top Ten Tips: Article 210, Branch Circuits
  12. ^ "AFCISafety.org". www.afcisafety.org. Retrieved 2016-03-28.
  13. ^ "Temperature Limitations of Connections Must Not Be Exceeded". Electrical Contractor Magazine.
  14. ^ Electrical Construction and Maintenance Magazine, Conductors for General Use, http://ecmweb.com/nec/code-basics/conductors-for-general-use-20110901; See Chapter 3 Articles in NEC, starting with Article 342
  15. ^ "334.30 Securing and Supporting". ElectricalLicenseRenewal.com.

  • Free, restricted access to the NEC online, 1968 through 2020 versions (Must register with the NFPA to access these documents)

Retrieved from "https://en.wikipedia.org/w/index.php?title=National_Electrical_Code&oldid=1102631702"